ROSATOM has obtained the construction permit for the Kuzminskaya wind farm in the Stavropol Krai
Notice: Undefined index: catFilterList in /home/zambi/public_html/wp-content/plugins/wp-likes/api.php on line 243
WindSGC JSC (part of Rosatom’s wind power division NovaWind) obtained the permit from the administration of the Kochubeevsky municipal district of the Stavropol Krai for the construction of the Kuzminskaya wind farm with a total capacity of 160 MW in the territory of Kochubeyevskiy urban district, the Stavropol Krai. The permit was preceded by a positive opinion of design document expert examination and site investigation in respect of the wind farm construction that includes 64 wind turbines with a capacity of 2.5 MW each. Successful expert examination confirms that the design documents for construction facilities comply with the site...